[1]
Habibov, I.A. and Abasova, S.M. 2020. EVALUATION OF THE INTER-REPAIR OPERATION PERIOD OF ELECTRIC SUBMERSIBLE PUMP UNITS. EUREKA: Physics and Engineering. 1 (Jan. 2020), 79-86. DOI:https://doi.org/10.21303/2461-4262.2020.001105.